天堂草原电视剧在线观看图片高清,亚洲精品你懂的在线观看,亚洲AV综合色一区二区三区,凹凸超碰69堂人人夜色,国产成人精品2021,亚洲国产精品久久久久秋霞,无码aⅴ精品一区二区三区浪潮,久久永久免费人妻精品直播,老司机福利在 线影院,亚洲人成自拍网站在线观看

Drilling number
Drilling number
  • International
  • Canada
  • US
  • 911

    Daily drilling / station

  • 194

    Daily drilling / station

  • 784

    Daily drilling / station

Crude oil prices
Crude oil prices
  • US crude oil
  • Brent
  • Latest price (USD / barrel): 78.78

    Highest:78.81 Lowest:76.22

  • Latest price (USD / barrel): 84.85

    Highest:85.34 Lowest:84

TOP
Product center

Products

Home > Products > Manifold > Well Testing Manifold

Products

Product name:Well Testing Manifold

Product introduction:The well tesing manifold is typically located on the rig floor, with other devices to evaluate the cement cementing quality, the cementing of foam cement and casing, as well as the collection of oil casing information, and provides flexible and variable flow control and well shut-in capability upstream of the process and measurement equipment during well test operations. The flow path on one side of the manifold has an adjustable choke and is used during well cleanup or draw down operations until a stable flow condition has been reached. The opposite side of the manifold houses positive, fixed-bean chokes that provide accurate flow control for predetermined flow rates under stable conditions. A full-bore bypass is incorporated through the center of manifold and can be used when choking downstream at the heater or open-flow conditions.

Product introductionTechnical ParametersApplication areasDownload certificate

Product description

The well tesing manifold is typically located on the rig floor, with other devices to evaluate the cement cementing quality, the cementing of foam cement and casing, as well as the collection of oil casing information, and provides flexible and variable flow control and well shut-in capability upstream of the process and measurement equipment during well test operations. The flow path on one side of the manifold has an adjustable choke and is used during well cleanup or draw down operations until a stable flow condition has been reached. The opposite side of the manifold houses positive, fixed-bean chokes that provide accurate flow control for predetermined flow rates under stable conditions. A full-bore bypass is incorporated through the center of manifold and can be used when choking downstream at the heater or open-flow conditions.

1.       Pipeline has a monitoring hole, timely monitoring of pipeline pressure, flow rate, temperature and so on;

2.       Adjustable choke valve can accurately regulate pipeline pressure and flow at any time;

3.       Manifold with a control cabinet, remote control, safe and reliable;

4.       Equipped gate valve adopts reliable single-plate gate valve, have passed PR2 certification, with reliable performance and durability.